PERMITS

Starting December 1, 2022, we will begin using OXCART permits system and we will no longer process permits in-house and the permits will no longer be available via this website. Permits must be submitted via www.oxcartpermits.com beginning December 1, 2022.

​The use of permits came about for safety and to protect the roads. Any county with heavy logging or oil well traffic will usually have a permit system to protect against damage to the roads. Permits are required to install a driveway, erect a sign, install a pipeline, put in a utility line and move an overweight or over width load on the right-of-way.

​Moving permits are issued for loads that are overweight, over width or over length. Generally, Montmorency County enforces the same restrictions as are established on the State Highways. In general, any load over 8-1/2 feet wide or over 65 feet long requires a permit. Mobile homes are allowed to move on County Roads with an approved permit. The load limits in Michigan depend on axle weight and on the tire size as well as how far apart the axles are.

​​The charge for the permit in most cases is to help defray the cost of someone going out to check on the permit and for damage to the roads. ​​Trucker's maps are available from the State Department of Transportation that have charts giving the maximum loads per axle. ​Annual "Extended Transportation Permits" are available but are not valid during the Spring Frost Laws.

​If driveways are put too close together, too close to an intersection or too high in relation to the road, they can cause a hazard. A driveway put in on a hill, generally, must have a culvert for proper drainage. If you were to pave your driveway and make it higher than the shoulder of the road, we could hit it with a plow and damage the plow or worse...have an accident. These are all reasons for us to require driveway permits and why we want to inspect each driveway location prior to issuing a permit.

​If you have a business and wish to put a sign in the right-of-way, Building and Zoning requires that you get a permit from them. You are also required to get one from the Road Commission. There are manyreasons for us to require a permit for signs. The main reason is safety.

Some examples of hazard are:

​     *  Signs that block the view from a driveway 

     *  Road signs that are in the way when snowplowing 

     *  Signs that detract from a driver's attention.

​Seismic lines, overhead power lines, telephone lines, buried cable, buried pipes and tree clearing on the right-of-way all require permits. In general, if you want to do something in the right-of-way, it is advisable to contact the Road Commission as it may prevent problems later. All permits are issued during regular business hours.